Core drilled glass spigots use an embedded mounting stem instead of an exposed fixing plate. They provide a different installation interface from deck mounted fittings. Coordinate core position, depth, drainage and the approved embedment method before the surrounding surface is finished.
Core drilled glass spigots use a mounting section located within a prepared hole in the supporting structure. The embedded connection differs from a surface base plate and can leave a compact fitting above the finished floor. Hengke Precision Metal Co., LTD can review the required body geometry against a project drawing.
Specify the glass thickness, panel layout, hole diameter and proposed embedment depth together. The substrate, edge distances, drainage and surrounding waterproofing also need review. Material grade, finish and the bedding or fixing arrangement should be agreed before production. The fitting must be assessed as part of the complete glass railing assembly, with installation details approved for the actual project.
| Name | Core Drilled Glass Spigots |
| Place of Origin | ShanDong,China |
| Brand Name | Hengke |
| Material | Stainless steel grade to the approved specification |
| Application | Glass railings with embedded spigot connections |
| Surface treatment | Finish and appearance to the approved sample |
| Process | Embedment geometry and machining to approved drawings |
| Service | OEM Customised |
| Glass interface | Glass thickness and gasket set to be confirmed |
| Dimensions | Body dimensions and embedment depth to approved drawing |
| Quality Control | Inspection criteria agreed before production |
Core drilling requires a prepared opening matched to the spigot mounting section. Confirm the hole diameter and embedment depth on a dimensioned drawing before site work begins.
Check that the supporting structure is suitable for the proposed connection, including the distance from the drilled hole to the slab edge.
Show reinforcement, waterproofing layers and finishes that could be affected by drilling or installation.
Record the finished floor level so that the exposed glass support height can be reviewed accurately.
The bedding or fixing material must be specified for the actual spigot, substrate and environment.
Coordinate the glass slot, gasket selection and panel thickness before the glass order is released.
Agree the visible finish and material grade with the supplier, together with any sample or inspection requirements.
Follow the approved installation sequence and allow for the specified curing and alignment checks before loading the assembly.
Send quantities, panel drawings, substrate information and delivery details for a quotation. Identify whether square or round body geometry is required to avoid substituting a visually similar fitting.



Discuss your core drilled glass spigots requirements with Hengke Precision Metal Co., LTD. Provide the panel layout, supporting surface and requested finish for a project-specific review.
Mark the proposed core locations before drilling and check for embedded services, reinforcement and waterproofing details. Record finished surface levels as well as structural levels. Keep access for installation and future inspection in mind, particularly near pool edges, drainage channels and changes in deck level.