Side mount glass spigots support glass panels from the edge of a balcony, stair or deck structure. Their fixing position helps keep the walking surface clear. Confirm the substrate, panel layout, edge distances and fixing access before selecting the assembly.
Side mount glass spigots position the glass support beside the mounting surface rather than directly above it. This arrangement suits layouts where the top edge needs to remain clear. Hengke Precision Metal Co., LTD can review the fitting against the project drawings, glass specification and intended fixing arrangement.
The clamp body, glass contact surfaces, gaskets and fixing interface must be considered together. Confirm glass thickness, edge distances, substrate condition and anchor requirements before selection. Dimensions, stainless steel grade and finish should be agreed in the approved specification. Structural suitability depends on the complete installed assembly, rather than the appearance of the spigot alone.
| Name | Side Mount Glass Spigots |
| Place of Origin | ShanDong,China |
| Brand Name | Hengke |
| Material | Stainless steel grade to the approved specification |
| Application | Side-fixed glass railing assemblies |
| Surface treatment | Finish and appearance to the approved sample |
| Process | Manufacturing route and machining to approved drawings |
| Service | OEM Customised |
| Glass interface | Glass thickness and gasket set to be confirmed |
| Dimensions | Customized Sizes |
| Quality Control | Inspection criteria agreed before production |
Side fixing locates the spigot against the face of the supporting structure. Check the available mounting depth and clearance before deciding its position along a glass run.
The glass panel layout should identify corners, changes in direction and any openings beside the railing.
Specify the glass build-up and thickness so that the contact surfaces and gasket arrangement can be reviewed together.
Provide drawings showing the substrate and the proposed fixing locations.
Anchor selection and edge distances require assessment for the actual supporting structure and project loads.
Agree the stainless steel grade, finish and visible surface requirements before an order is released for production.
Check dimensions and assembly details against an approved sample or drawing rather than relying only on product photographs.
Installation should follow the approved project documentation, including alignment, fixing and glass handling requirements.
For a quotation, send quantities, drawings, glass details and delivery requirements. These details help distinguish a side-mounted fitting from deck-mounted or core-drilled alternatives.



Discuss your side mount glass spigots requirements with Hengke Precision Metal Co., LTD. Provide the panel layout, supporting surface and requested finish for a project-specific review.
Check whether installers can reach the fasteners after the glass and surrounding finishes are fitted. Show corners, changes in level and panel joints on the layout drawing. For replacement projects, provide photographs and measured hole centres so that a visually similar fitting is not mistaken for a compatible assembly.